Passability has been restored on the bridge over the Daque river, on Rural Road number 601, in the Chitima-Mágoè section, in the province of Tete. Traffic was interrupted on the 19th of January last, due to intense rains that caused the bridge to collapse. Through a statement, the National Road Administration (ANE), Tete delegation, explains that emergency works were carried out which consisted of assembly of a metal bridge and construction of respective access ramps. Source:O País

Tradução automática do artigo:Aceder ao artigo original

Leave a Reply

Your email address will not be published. Required fields are marked *